Monday, December 6, 2010

Kannapolis,NC.,FM/ Charlotte,NC.

Building.


Inspection sheet.


Foyer, General pic.


Hallway w/surface mount lights.


Metal speaker box mounted incorrectly to ceiling grid,makes tile sag.


Won door framing in classrooms.


Attic area / suspended hvac w/straps to framing.


Ceiling grid supported by wire and lags to framing.


Rm.106 has loose and broken tile supporting speaker.


general pic. Of classroom.


Relief society , general pic.


Font mirror.


Stainless steel braces bolted framing.


.relief society missing sprinkler cover.


Loose tile in hall at primary room.


Sprinkler cover missing in hall at rm. 111 w/water damage.


Projection screen in Chapel mounted to framing.


Chapel ceiling w/wood framed speaker array.


Projection screen mounted to framing in cultural hall.


Cultural hall.


Speakers mounted to framing w/steel braces and chains + hooks.


Score board mounted to wall.


Stage curtains supported by chain + hooks.


Mezz. Area w/suspended piping and ductwork .


Firewall in attic trying to reach basketball support framing.


Firewall.


Access panel covered by hvac and piping.



No comments:

Post a Comment